Sector 104, Gurugram
We do not pick one. Below is what each states about itself, what we could check against a public record, and, named rather than left blank, what neither of us can answer.


What each one costs
Every figure below is published by the project or computed the same way its own page computes it. Nothing is averaged, and a disagreement between sources renders as a range.
| Godrej Summit | M2K Olive Green Floors | |
|---|---|---|
| Asking rate | ₹6,491 per super sq ft ≈ ₹9,985 per carpet one listing | ₹14,748 per super sq ft ≈ ₹22,689 per carpet one listing |
| Both quoted on the same area basis — that is one of the reasons these two are on a page together. | ||
| All-in, per carpet sq ft | ₹15,705a modelled rate card | ₹30,060a modelled rate card |
| The quoted rate plus development charges, GST, stamp duty and registration, divided back over carpet area. Same calculation as each project’s own page — statutory rates are published, development charges are marked where we had to model them. | ||
| Ticket, as published | ₹1.65 Cr – ₹2.69 Cr | ₹1.70 Cr – ₹1.89 Cr |
| These overlap. That is the test that put the two on one page: a budget that reaches one reaches the other. | ||
| A 3 BHK here | ₹1.65 Cr – ₹1.84 Cr 2,534–2,837 sq ft super ≈ 1,647–1,844 sq ft carpet 5 listed | ₹1.70 Cr – ₹1.89 Cr 1,146–1,282 sq ft super ≈ 745–833 sq ft carpet 3 listed |
| The configuration both projects list most of, priced as each publishes it. Nothing is converted or estimated by us. | ||
| Against comparable homes | ₹1,592 below the median of 22 comparable homes our cohort | ₹4,475 above the median of 35 comparable homes our cohort |
| Not against each other — against every home we hold on the same area basis, price tier and lifecycle. | ||
What the public record holds
| Godrej Summit | M2K Olive Green Floors | |
|---|---|---|
| Registration | RERA-GRG-653-2020hrera register | RERA-GRG-1822-2024hrera register |
| A registration we cannot confidently attach is a limit of our matching and says nothing about the project. We say which it is. | ||
| Registered until | 30/09/2018 past its end date, and HRERA does not flag it lapsed — the register disagrees with itself contradiction on record | 31/12/2029registration up-to |
| Stage and possession | Ready To Move possession stated as 2018-09 as listed | Under Construction possession stated as 2029-12 as listed |
The building and the developer
| Godrej Summit | M2K Olive Green Floors | |
|---|---|---|
| Developer | Godrej Properties 18 projects we track, 3 town-planning licences tcp rolls | M2K Group 4 projects we track our corpus |
| Size | not on record | not on record |
| Amenities | 41 counted 32 of them premium as listed | 44 counted 32 of them premium as listed |
| A count of what is listed. It says nothing about what any of it is worth. | ||
| Nearest metro | 9.7 kmnamed station | 8.0 kmstraight-line |
| Resale outlook | Slower to resell how contested selling it again would be our index | Hard to resell how contested selling it again would be our index |
| Our own index, filed nowhere: built from liquidity, pipeline, price position and location, and validated against resale listings. | ||
The short version
Each line names the figure it came from. None of them is advice.
Not compared
These fields are missing for one or both projects, so no comparison is drawn. Named here rather than left blank, where an absence would read as a finding.
On Godrej Summit
On M2K Olive Green Floors
The part you were expecting
Keep going


Other comparisons with these two