Sector 89, Gurugram
We do not pick one. Below is what each states about itself, what we could check against a public record, and, named rather than left blank, what neither of us can answer.


What each one costs
Every figure below is published by the project or computed the same way its own page computes it. Nothing is averaged, and a disagreement between sources renders as a range.
| Godrej Zenith | M3M Soulitude | |
|---|---|---|
| Asking rate | ₹14,554 per super sq ft ≈ ₹22,391 per carpet one listing | ₹8,461 per super sq ft ≈ ₹13,016 per carpet one listing |
| Both quoted on the same area basis — that is one of the reasons these two are on a page together. | ||
| All-in, per carpet sq ft | ₹29,724a modelled rate card | ₹19,130a modelled rate card |
| The quoted rate plus development charges, GST, stamp duty and registration, divided back over carpet area. Same calculation as each project’s own page — statutory rates are published, development charges are marked where we had to model them. | ||
| Ticket, as published | ₹2.21 Cr – ₹5.65 Cr | ₹1.44 Cr – ₹2.38 Cr |
| These overlap. That is the test that put the two on one page: a budget that reaches one reaches the other. | ||
| A 3 BHK here | ₹3.42 Cr – ₹4.51 Cr 1,676–2,211 sq ft super ≈ 1,089–1,437 sq ft carpet | ₹1.85 Cr – ₹2.38 Cr 2,189 sq ft super ≈ 1,423 sq ft carpet 3 listed |
| The configuration both projects list most of, priced as each publishes it. Nothing is converted or estimated by us. | ||
| Against comparable homes | ₹4,176 above the median of 35 comparable homes our cohort | ₹3,641 below the median of 37 comparable homes our cohort |
| Not against each other — against every home we hold on the same area basis, price tier and lifecycle. | ||
What the public record holds
| Godrej Zenith | M3M Soulitude | |
|---|---|---|
| Registration | RERA-GRG-1536-2024hrera register | RERA-GRG-940-2021hrera register |
| A registration we cannot confidently attach is a limit of our matching and says nothing about the project. We say which it is. | ||
| Registered until | 31/03/2031registration up-to | 30/09/2025 past its end date, and HRERA does not flag it lapsed — the register disagrees with itself contradiction on record |
| Stage and possession | New Launch possession stated as 2031-03 as listed | Ready To Move possession stated as 2024-01 as listed |
The building and the developer
| Godrej Zenith | M3M Soulitude | |
|---|---|---|
| Developer | Godrej Properties 18 projects we track, 3 town-planning licences tcp rolls | M3M India 40 projects we track, 5 town-planning licences, 8 refused applications tcp rolls |
| Size | not on record | not on record |
| Amenities | 45 counted 27 of them premium as listed | 53 counted 35 of them premium as listed |
| A count of what is listed. It says nothing about what any of it is worth. | ||
| Nearest metro | 12.9 kmstraight-line | 12.6 kmstraight-line |
| Resale outlook | Slower to resell how contested selling it again would be our index | Mixed resale market how contested selling it again would be our index |
| Our own index, filed nowhere: built from liquidity, pipeline, price position and location, and validated against resale listings. | ||
The short version
Each line names the figure it came from. None of them is advice.
The part you were expecting
Keep going


Other comparisons with these two